Cadres IT Operations & Infrastructure
Sheet BEA-02 Rev 2026.08
Start Trial

Sheet BEA-02 — ITSM Manual

Automation & Change Governance

Journey automation, change approval, CAB and freeze windows, and major incident response.

Audience: Service delivery managers and change owners Focus: Deterministic automation and governed change

What this area covers

Beacon automates repeatable service work with journeys and governs risky work with the change process. This area covers both, plus the major incident layer that takes over when normal handling is not enough.

Operational areas in scope

Area What operators need from it Why it matters
Journey templates Ready-made automations you enable and tune, not build from scratch Most desks need the same twenty automations, not a workflow engine
Journey studio and runs A place to author custom journeys and watch every run Automation you cannot inspect is automation you cannot trust
Change lifecycle Authoring, governance gates, CAB approval, scheduling, and review Change risk is managed before implementation, not explained after it
Freeze windows and collisions Scheduling that respects blackout periods and detects double-booked kit Two changes on the same system in the same window is how outages start
Major incident operations Declaration, roles, a comms drumbeat, and stand-down Major incidents fail on coordination more often than on technology
Post-incident review A mandatory review that spawns the root-cause problem An incident closed without learning will happen again

What operators are actually managing

  • Decide which journey templates run, with what parameters, and which stay off.
  • Keep custom journeys dry-run tested before they touch live tickets.
  • Hold the change governance gate even when the calendar is under pressure.
  • Schedule changes around freeze windows and check for collisions before approval.
  • Run major incidents with named roles and a communication rhythm stakeholders can rely on.

What this public manual area includes

  • The journey template gallery and the journey studio.
  • Change management end to end, including emergency changes.
  • Major incident operations from declaration through post-incident review.

What healthy operation looks like

  • Automation handles the repetitive work and leaves the judgment calls to people.
  • Every journey run is visible from the ticket it touched.
  • Changes clear governance because the process is fast, not because it was skipped.
  • Major incidents end with a review, a root-cause problem, and fewer repeats.